From June 2019 through the Fall of 2019 we started getting to know the boat. We had a significant punch list from the survey of things to fix. All running rigging, sails, canvas and yes, the holding tanks needed replacing. The latter was.. well.. wicked gross. We did our best to repair the forward tank to get through the summer, but finally had to succomb to removing it and having a new one installed. Thanks to our friends at HeadSync for helping us with that project. Below are a series of instagram posts on that summer’s projects.